July begins the next phase of roadway construction on Cedar Springs Road (Herb Kelleher Way), with work continuing on the lower level lanes of Cedar Springs.
Travelers should be aware that roadway construction will continue through the summer and into late fall of 2012.
Lanes will be re-routed as we continue progress on expanding and adding lanes on Cedar Springs. Temporary lanes have been built to ensure traffic flow continues to run smoothly. Roadway construction is expected to have low impact on travelers; however, watch for traffic signs and abide to speed limits when driving through work site areas.
Since the summer travel season is underway, we recommend you arrive 90 minutes before your departure to ensure plenty of time for traffic, drop-off/parking, ticket and baggage check-in, and security screening.